China’s charging network passed 23 million points in June. The number that matters for hiring is not the total. It is the split.
The National Energy Administration put the national count at 23.06 million units at the end of June 2026, up 43.2% year on year. Private home chargers grew faster than the public network — up 54.6% to 16.18 million. Public high-power guns, the ones that can put 300 kilometres into a car in the time it takes to drink a coffee, passed 180,000.
Then there is the electricity bill. Charging and battery-swap services consumed 81 billion kilowatt-hours in the first half of 2026, up 56.9% year on year, according to the same release. That is one of the fastest-growing line items in the entire national power ledger.
Read those three numbers together and a staffing problem appears that has almost nothing to do with electrical engineering. China can manufacture chargers. It can install them. What it struggles to hire is the person who gets a site approved, gets the grid connection upgraded, and keeps the landlord from walking away in year three.

The job that gets built before the hardware
In most markets, a charging project starts with a site. In China, it starts with a piece of paper — the grid connection application that asks the local grid company for additional capacity. A 20-gun high-power hub can need several megawatts of new load. That request runs into whatever headroom the local distribution network has left, and in dense urban districts that headroom is often zero.
So the first obstacle is not a charger. It is a transformer, a cable trench, and a queue.
The person who manages that queue is usually called a site development manager, sometimes a site acquisition manager. The title sounds like real estate. The work is closer to industrial diplomacy: reading a distribution network’s spare capacity, negotiating a revenue-share lease with a shopping mall owner who has already been burned by a previous operator, coordinating fire-safety review for lithium batteries stored underground, and then holding the project schedule together when the grid upgrade slips by two quarters.
At TELD and Star Charge, the two largest independent operators, job postings for these roles ask for three things repeatedly: experience with grid connection applications, a working relationship with local grid subsidiaries, and a track record of hitting commissioning dates. None of those appear in a mechanical engineering curriculum.
SunTzu Recruit’s Shenzhen desk has watched that requirement harden over the past eighteen months. Clients now interview for grid relationships before they discuss hardware.

Why the engineers are the easy part
China graduates more electrical engineers than any other country. The hardware supply chain — power modules, connectors, liquid-cooling cabinets — sits within a few hundred kilometres of Shenzhen and Changzhou.
The engineering is standardized; the sites are not. Every hub is a one-off negotiation with a landlord, a fire bureau, a grid subsidiary and a district government that has its own targets for charging density.
That is why operators keep hiring site development staff while freezing headcount elsewhere. The capital expenditure is approved at the top. The bottleneck sits with the person who can convert a plot into an energised asset in under nine months.

What the pay data actually says
Here the public record gets thin, and it is worth saying so plainly. Neither the NEA nor the major recruitment platforms publish a salary band for site development managers specifically. The closest official anchor is the National Bureau of Statistics average for urban non-private employers, which was RMB 124,110 a year in 2024, and the electricity, heat and gas production sector has historically run above the national mean.
The directional signal is better than the level. A 21st Century Business Herald analysis in August 2026, drawing on recruitment platform data for the first half of the year, found pay increases of 10% to 30% across power equipment, industrial automation, instrumentation and electrical machinery roles. That is a wide band, and it is a real one: the same analysis recorded AI agent development demand up 244% over the same period, pulling engineering pay upward across adjacent hardware categories.
For a foreign operator or automaker building charging assets in China, the practical read is this. You will not outbid a domestic operator on base salary for a good site development manager in Hangzhou or Shenzhen. You can beat them on decision speed, on the willingness to sign a fifteen-year lease, and on the freedom to walk away from a site that will never get capacity.

The utilisation trap
There is a counter-argument worth taking seriously. A large share of China’s public chargers run at low utilisation, and some analysts treat site development as a cost centre that adds stations nobody uses. Build fewer, run them harder — that is the argument.
The electricity data pushes back, at least at the aggregate. A 56.9% jump in charging-sector consumption against a 43.2% jump in installed points means the average point is moving more energy than a year ago, not less. Growth in usage is outrunning growth in hardware.
Where the sceptics are right is at the margin. The chargers that fail are the ones sited by spreadsheet — a highway exit with no toilet, no lighting, and a landlord who leased the land for three years. The ones that work have a site manager who thought about where a driver waits at 11pm.
What this means for hiring in the next four quarters
Three things follow, and they are the parts a country manager can act on this quarter.
First, stop writing the job description around equipment. A site development manager who has commissioned twenty hubs in the Pearl River Delta is worth more than a power electronics engineer who has never filed a grid connection application, because the second profile is abundant and the first is not.
Second, expect a nine-to-twelve-month ramp for a new hire to become productive, most of which is spent building relationships with two or three grid subsidiaries. Hiring in month one of a build programme is already late.
Third, do not assume the role can be imported. A site development manager hired from Germany or the Gulf will spend their first year learning why a landlord in Bao’an wants a different lease structure than a landlord in Pudong. SunTzu Recruit runs these searches on the ground in Shenzhen, Shanghai and Chengdu, and the pattern is consistent: the candidates who clear the bar come from domestic operators, grid-adjacent engineering firms, or the real estate side of retail.
The quiet part
China’s charging buildout is often described as a hardware story — a manufacturing achievement, a subsidy story, a victory of scale. The 23 million number invites that reading.
The operating reality is more mundane. Somebody has to sit in a district grid office with a load application and a schedule, and argue. That person is not on the cover of any industry report. They are the reason the network works, and they are the hire most foreign firms in China get wrong the first time.
SunTzu Recruit spends a good part of its charging searches correcting exactly that first mistake.
FAQ
Q1: Why is a site development manager the first hire for a charging network in China?
A1: Because grid capacity, not hardware, sets the schedule. A 20-gun high-power hub can need several megawatts of new load, so each project begins with a grid-connection application, a lease negotiation with the landlord and a fire-safety review. The site development manager runs that process. Chargers and installers are comparatively easy to source.
Q2: Where do foreign companies find charging site development managers in China?
A2: Mainly at domestic charging operators, grid-adjacent engineering firms and the real estate side of retail. Operators such as TELD and Star Charge hire for three things: grid-connection application experience, relationships with local grid subsidiaries, and a record of hitting commissioning dates. A manager brought in from Germany or the Gulf rarely has any of them.
Q3: How much do charging site development managers earn in China?
A3: No official salary band exists for the role. The closest anchor is the National Bureau of Statistics 2024 average of RMB 124,110 a year for urban non-private employers. Recruitment-platform data for H1 2026 showed pay rises of 10% to 30% across power equipment, industrial automation and electrical machinery roles.
Q4: How long does a new charging site manager take to become productive in China?
A4: Expect nine to twelve months, mostly spent building relationships with two or three local grid subsidiaries. Hiring in the first month of a build programme is therefore already late. Foreign operators can compete on decision speed and lease flexibility rather than base salary.
Sources: National Energy Administration (June 2026 national charging infrastructure release, via 21st Century Business Herald and Sina Finance), 21st Century Business Herald (August 2026 recruitment pay analysis), National Bureau of Statistics (2024 urban non-private average wage).