Jiangsu's 24 listed storage projects pay through a capacity-price list, and failing the grid-interface test removes a plant from it. SunTzu Recruit's read: hire the pre-sales solution engineer and the grid-test lead before the EPC tender, because the commissioning date is fixed and neither seat can be sourced on a job board.